Our research cited by
Hire a Multifamily Feasibility Study Consultant
MMCG Invest prepares an independent, lender ready feasibility study for your SBA, USDA or bank loan file, signed by the principal, Michal Mohelsky, J.D., FMVA.
- From $4,900
- 9 to 16 business days
- Rush delivery is available from 5 business days
- Payment: 50 percent at engagement and 50 percent on delivery
- Written acceptance guarantee: any revision the lender or agency requires is made at no additional cost
- Track record: $2.3 billion construction cost analyzed and $1.7 billion loan amount, January 1 to September 1, 2026
- (628) 225-1110
What Georgia's rules change in a multifamily underwriting
Only an analyst on DCA's approved list, working to DCA's manual
The plan's threshold criteria require a market study by a market analyst approved by DCA, in the format required by the DCA Market Study Manual, and the 2026 manual says it in one line: the Market Analyst must be on DCA's approved list (1)(2). The study must be completed no more than six months prior to Application Submission and must reflect the rents and unit mix of the Core Application (1). Unless the manual states otherwise, the analyst's processes must conform to the standards of the National Council of Affordable Housing Market Analysts, and the analyst who prepares the report must physically visit the site, all of the comparable properties and the market area in general (2). The signed statement the manual prescribes has the analyst affirm that he or she has no interest in the project and that compensation is not contingent on the project being funded (2).
DCA is not bound by the analyst's opinion or conclusions, may require an updated study during the review period to reflect pending projects in overlapping market areas, and reserves the right to revoke its approval of a third party report provider whose reports show a pattern of falling short of the plan or the manual (1).
Capture rate limits differ between the Metro Pools and the Rural Pool
Among the factors DCA considers indicative of market feasibility, the plan limits the capture rate for all one-bedroom units to 30 percent or less in Metro Pool areas and 35 percent or less in Rural Pool areas, and holds tax credit and market rate units overall to 30 percent in the Metro Pools and 35 percent in the Rural Pool; the table gives every bedroom count (1).
| Units | Metro Pool areas | Rural Pool areas |
|---|---|---|
| All one-bedroom units | 30 percent or less | 35 percent or less |
| All two-bedroom units | 30 percent or less | 35 percent or less |
| All three-bedroom units | 40 percent or less | 40 percent or less |
| All units of four or more bedrooms | 50 percent or less | 50 percent or less |
| Tax credit and market rate units overall | shall not exceed 30 percent | shall not exceed 35 percent |
A further limit applies inside the unit mix: the capture rate for each bedroom type within each income segment, which the plan lists as 30 percent, 50 percent and 60 percent of area median income and market, shall not exceed 60 percent (1). The manual supplies the arithmetic. Net demand is total demand less the supply of competitive vacant or pipeline units, that supply must include all competitive units in properties that have not yet reached stabilized occupancy, among them those recently funded by DCA or proposed for a bond allocation from DCA, and the capture rate is the number of units divided by net demand for each unit and bathroom size and income level (2).
Demand is built on 1.5 persons per bedroom and a 35 percent housing cost share
The manual fixes the two inputs that decide how many renter households qualify. The maximum income level per household for every bedroom type rests on a standard of 1.5 persons per bedroom for family developments, rounded up to the next whole number, and on a maximum of 2 persons per household for Elderly or Housing for Older Persons developments (2). Family households are assumed able to pay no more than 35 percent of gross income towards total housing expenses, and senior households no more than 40 percent (2). Elderly demand is counted from households 62 years or older and Housing for Older Persons demand from households 55 years or older (2). On the market area the manual is blunt: analysts may not simply use a radius, the gravity model is appropriate in rural areas, and the report lists every Census tract the area takes in, partially or fully (2).
Supply is surveyed within two miles of the site, ten miles for a Rural property
The competitive rental analysis must cover every competitive rental property that can be considered a true alternative, all subsidized low-income developments in the market area, and all properties within two miles of the subject property or ten miles for Rural properties (2). The analyst visits the competitive properties, analyses all multifamily projects whether proposed, under construction or placed in service, and maps the low-income housing around the site, from tax credit and bond properties to USDA financed properties, public housing and HUD 202 or 811 properties (2). Where a rural area lacks enough multifamily comparables, the manual asks for data on single-family rentals, rental trailer homes and duplexes (2).
Three lease-up tests: 93 percent, twenty-four months and a 10 percent rent advantage
The plan's feasibility factors include an absorption period of less than twenty-four months to reach stabilized occupancy and a stabilized occupancy rate of 93 percent or above, which the analyst must specify (1). The manual asks for the number of months the project needs to stabilize at 93 percent and for a written statement where the vacancy and stabilization rates for the market area are not within DCA's maximum, printed as 7 percent and 24 months (2). On rents, the minimum differential between the proposed rents and achievable market rents must be 10 percent for units at 60 percent of area median income or less, and rents at 70 or 80 percent must be below market (1). The manual computes the rent advantage as achievable market rent less proposed rent, divided by the proposed rent (2), so the percentage is measured on the restricted rent, not on the market rent.
DCA also looks for no more than two DCA funded projects in the primary market area that have physical occupancy rates of less than 90 percent and compete for the same tenant base, and for overall market and LIHTC stabilized occupancies of 90 percent or greater (1). An application is ineligible for award if DCA determines that the property would have an adverse financial impact on existing tax credit, HOME, National Housing Trust Fund or CDBG-DR properties within or close to the primary market area, and DCA's judgment on the size of the market area and on adverse impact is the final determination (1). These are DCA's thresholds, not measurements of any Georgia market.
Atlanta Metro, Other Metro or Rural: how the pool is assigned, and the credit ceiling by application type
The Atlanta Metro Pool is defined by four counties, Fulton, DeKalb, Gwinnett and Cobb, and a site in one of them stays in that pool whether or not it is also in a USDA-eligible area (1). The Rural Pool is every USDA eligible area outside the Atlanta Metro Pool, and the Other Metro Pool is all that remains (1). In the 9 percent New Affordability competition DCA targets 35 percent of the credits to the Rural Pool, 35 percent to Other Metro and 30 percent to Atlanta Metro (1).
The application type, and for New Affordability the pool, limits the request. DCA will not award an application more than 1,350,000 in 9 percent credits for New Affordability in the Metro Pools, 1,215,000 for New Affordability in the Rural Pool, 1,270,000 for HUD Preservation or 1,145,000 for Housing Credit and USDA Preservation (1). A developer may submit no more than four applications per Competitive Round, an applicant may hold an interest in a maximum of two selected projects per round, and DCA sets aside 15 percent of the available 9 percent credits for non-profit sponsored applications (1). In selecting 9 percent New Affordability applications, where more than one application receives a competitive score in the same market area and will serve the same tenancy, DCA selects the higher scoring one, and Family, Elderly, HFOP and Other are each distinct tenancies (1).
Underwriting floors: expenses per unit by pool, 7 percent vacancy and collection loss, and a DCR held for fifteen years
DCA's underwriting policies set the operating budget before the sponsor does. Annual budgeted operating expenses, excluding reserve contributions, must be no less than $6,500 per unit for Atlanta Metro Pool projects, $6,000 for Other Metro Pool projects and $4,250 for Rural Pool projects (1). A waiver of the minimum must be asked for at the Waiver Request, and one of its conditions is that rent projections be at least 10 percent below the lower of market or the tax credit maximum (1). Applications trend revenue at 2 percent per year and operating expenses at 3 percent, DCA underwrites vacancy and collection loss at the higher of 7 percent or a percentage it determines is appropriate, and ancillary income is allowed at a maximum of 2 percent of gross potential rents (1).
Developments with debt must meet, for fifteen years, a minimum debt coverage ratio (DCR in the plan, the DSCR of a lender's credit memo) of 1.20 for new construction and 1.25 for rehabilitation, with deferred developer fee not counted as debt (1). Each year stands alone: a reserve funded in one year may not be withdrawn in a later year to satisfy the ratio, and an excess in one year is not credited to another (1). The plan adds a second ratio for all developments with debt, effective gross income to total annual expenses including the reserve for replacement, of 1.10 for new construction and 1.15 for rehabilitation (1). Permanent debt financing must have a minimum term of ten years, and DCA may waive the minimum DCR for USDA 515 developments that clearly demonstrate feasibility (1).
Reserves, fee limits and a cost ceiling built on HUD's limits
Every development funds an operating deficit reserve of six months of operating expenses plus six months of debt service, held for the Compliance Period, and a rent-up reserve of three months of projected operating expenses (1). The minimum replacement reserve contribution is $300 per unit per year for new construction, $400 for rehabilitation, $420 for historic rehabilitation and $470 for single family units and duplexes, and contributions must escalate 3 percent per year (1).
The developer fee on a 9 percent new construction application is limited to the lesser of 13 percent of total development cost, excluding the fee and all reserves, $2,700,000 or $38,000 per unit; on a bond new construction application the limits are the lesser of the same 13 percent, $4,500,000 or $30,000 per unit (1). The deferred portion cannot exceed 50 percent of the fee at Application Submission and must be payable from available cash flow within fifteen years (1).
Total development cost is measured against HUD's Total Development Cost Limits raised by a DCA percentage: in the Metro Pools 60 percent for an efficiency, 50 percent for one and two bedroom units, 25 percent for three bedrooms and 20 percent for four, and in the Rural Pool 30, 25, 25, 20 and 15 percent (1). Applications in the 2026 rounds use HUD's 2025 limits and applications in the 2027 rounds use HUD's 2026 limits, with each Georgia county assigned to a metropolitan area named in the plan (1). Separately, the total hard cost of a project may not exceed 90 percent of the as completed unencumbered appraised value (1).
A state credit that matches the federal credit, under a $100 million cap through 2028
Georgia attaches its own housing tax credit to a federal award. DCA's memorandum on the 2026 legislation, read in its updated version, answers that DCA is required to match the federal and the state credit at 100 percent, dollar for dollar, and has no authority to deviate from that match for approved developments (5). House Bill 1199, read in the version passed by the House and Senate, added a paragraph under which the aggregate annual amount of tax credits allowed shall not exceed $100 million for taxable years 2026 through 2028, and the act applies to taxable years beginning on or after January 1, 2026 (3).
Three documents word that cap differently, and the wording decides what counts against it. House Bill 1199 speaks of credits allowed (3). The House Committee on Rules substitute to Senate Bill 306 that we read changes the words to credits initially awarded and to each of the taxable years 2026 through 2028; we did not read the enrolled act (4). DCA's memorandum quotes the paragraph in the initially awarded form, says the two bills were signed into law on March 20, 2026 and May 6, 2026, and concludes that the cap applies solely to the initial grant in the taxable year it is awarded (5). DCA's bond award document, published August 21, 2026, describes the same law as limiting the aggregate annual amount of 9 percent and 4 percent Housing Tax Credits awarded to $100 million (6).
The code as printed in the 2024 Edition of the Official Code of Georgia Annotated, which includes the Acts of the 2024 session, gives two terms an investor prices: the state credit, together with the credits authorized under a companion Code section, in no event exceeds the federal housing tax credit allowed for the project, and any unused credit is carried forward to the taxpayer's next three succeeding years' tax liability and is not allowed against prior years (11). That edition predates House Bill 1199 and prints no cap; the cap is stated on this page from House Bill 1199 as passed, the Senate Bill 306 substitute and DCA's memorandum, and we did not check the other Acts of the 2025 and 2026 sessions against the Title 48 sections this page states (3)(4)(5)(11).
DCA's bond award document of August 21, 2026 states that credit availability in the bond round equals $100 million minus the 9 percent credits allocated, and that DCA allocated $51,855,459 in 9 percent credits, leaving $48,144,541 of credits for bond financed awards (6). For future rounds the document anticipates about $40 million of 9 percent credits, leaving $60 million (6). The memorandum adds that a 9 percent project is limited to the credit amount in its Carryover Agreement, while a bond financed project may request additional credits at final allocation when eligible basis has been generated (5). In underwriting, DCA prices all 9 percent applications at no less than 90 percent of the median equity price of the round, by geographic pool, and will not allocate state credits to a project that shows a price below the reasonable fair market price for credits (1).
Bond deals: 30 percent of aggregate basis, a $25 million request and two bodies that award
For a bond application the plan allows no more than 30 percent of a development's aggregate basis to be financed by tax-exempt bonds, ties each application to one bond issuance, and caps the Bond Allocation request at $25 million, a limit DCA may exceed and that does not apply under the Urban Housing Reservation (1). The volume itself follows a formula that DCA sets out for 2026 (6).
| Step in DCA's 2026 bond formula | Amount | Calculation DCA gives |
|---|---|---|
| Georgia State Bonds Ceiling | $1,525,870,980 | 11,302,748 (2025 population) times $135 per capita |
| Housing Share | $648,495,167 | 42.5 percent of the ceiling |
| Urban reservation | $123,214,082 | 19 percent of the Housing Share |
| Local reservation | $123,214,082 | 19 percent of the Housing Share |
The local urban residential finance authority determines awards under the urban reservation, and DCA is entitled only to the local housing reservation for its bond awards, together with any ceiling reallocated from the economic development share or the Georgia Housing Finance Agency reservation (6). These figures are DCA's, from its award process document; we did not read the code sections that document cites.
The two versions of the plan that we read treat a site inside the city of Atlanta differently. The earlier version of the 2026-2027 plan states that applications in the city of Atlanta are eligible for selection under the urban authority's Bond Allocation reservation only, and are ineligible for selection under DCA's remaining strategies (7). The amended version drops the first of those sentences, states under the non-set aside strategy that applications in the city of Atlanta are ineligible for selection, and adds a last step: DCA will not select an Atlanta application as the final selected application unless there is no other non-selected application, with Bond and Credit requests at or below the amounts remaining, that qualifies under the geographic limitations and balancing criteria (1). DCA's award process document, published August 21, 2026, says it describes the process under the proposed amendments to the 2026-2027 plan, announced on July 22, 2026 and updated August 18, 2026 (6); we did not verify whether or when the amended plan was approved.
Outside Atlanta the amended plan spreads the selections: at least one in each Bonds Geographic Distribution Area, provided an application there meets all application submission requirements and there is enough Bond Allocation and Credit capacity to fund one in each Area, and, subject to its balancing exceptions, no more than two in an Area, two in a county with a population of 400,000 or greater and one in a smaller county (1).
House Bill 404 of 2024: a deposit ceiling, a three business day notice and cooling as a utility
House Bill 404 of 2024, the Safe at Home Act, read in the version passed by the House and Senate, applies to residential lease agreements entered into or renewed on or after July 1, 2024 (8). It adds a Code section under which no landlord shall demand or receive a security deposit in an amount that exceeds the equivalent of two months' rent (8). Where a tenant fails to pay rent, late fees, utilities or other charges, the owner may immediately go before a judge, a court clerk or a magistrate and make an affidavit under oath to the facts once the tenant, having been given a notice to vacate or pay all past due rent, late fees, utilities and other charges within three business days, refuses to pay or fails to deliver possession; the notice is posted in a sealed envelope conspicuously on the door of the property and delivered by any additional method agreed in the rental agreement (8). The act also deems every agreement for the rental of real property as a dwelling place to include a provision that the premises is fit for human habitation, and it defines the utilities a landlord answers for as cooling, heat, light and water service (8). We did not check whether these sections have been amended since the 2024 act.
Recording and transfer taxes at closing, and the 62 months of House Bill 586
O.C.G.A. 48-6-61, as printed in the 2024 Edition of the Official Code of Georgia Annotated, imposes an intangible recording tax on the instrument that secures a long-term note, at the rate of $1.50 for each $500.00 or fraction thereof of the face amount of the note, requires the holder to record the instrument within 90 days from its date, lets the holder pass the tax on to the borrower, and sets the maximum tax payable on any single note at $25,000.00 (12).
House Bill 586, in the version passed by the House and Senate, changes which notes count as long term: a long-term note secured by real estate is one in which any part of the principal falls due more than 62 months from the date of the note or of the security instrument (9). A security instrument for a note that falls due within 62 months may state that fact in lieu of the due date (9). The 2024 Edition still prints, in O.C.G.A. 48-6-60, the test House Bill 586 strikes, a note any part of whose principal falls due more than three years from its date, so it predates the bill (9)(12). We did not verify the bill's effective date, and we did not read an edition of the code printed after it.
On a purchase, O.C.G.A. 48-6-1 in the same 2024 Edition imposes a transfer tax at the rate of $1.00 for the first $1,000.00 or fractional part and 10 cents for each additional $100.00 on each deed, where the consideration, exclusive of any lien that existed before the sale and is not removed by it, exceeds $100.00 (12).
Georgia's award record and credit room, as DCA publishes them
The last 9 percent round for which we read DCA's announcement is the one announced on September 23, 2025 under the 2024-2025 plan: $37,235,164 in Housing Tax Credits to construct or preserve 31 affordable housing developments, 25 of them new construction properties and six rehabilitation, adding 1,983 units (10). Twenty of the properties were designated for families, 10 for senior citizens and one for persons with disabilities (10). DCA's bond award document of August 21, 2026 gives totals and no award list; as of that document, $48,144,541 of credits remained for bond financed awards under the $100 million limit (6). The study measures the Georgia market area itself, inside the two mile or ten mile survey the DCA manual prescribes, by the steps in our methodology; this page reports only what DCA has published.
The DCA calendar, from qualification to the equity closing
The dates are the deadlines the 2026-2027 plan prints, the first of each pair for its 2026 Competitive Round and the second for its 2027 round (1).
- Qualification and pre-application. The Qualification Determination is required and costs $2,000, and the plan's pre-application deadlines for the 9 percent rounds are February 27, 2026 and February 26, 2027 (1).
- Market study and appraisal. The study must be completed, and the appraisal's effective date must fall, no more than six months before Application Submission (1).
- Competitive application. The plan requires all documents by 5:00 pm on its deadlines, May 8, 2026 and May 7, 2027 for 9 percent credits and September 25, 2026 and September 24, 2027 for bond applications (1). DCA sends applicants the preliminary scoring results and they have 48 hours to respond (1).
- Reconsideration and appeal. A request for reconsideration is due not later than fourteen calendar days after the notification of final scoring, and an appeal within seven calendar days of the letter denying it (1).
- Waiver requests. The plan's deadlines are October 9, 2026 and October 8, 2027 for the 9 percent rounds, and February 26, 2027 and February 25, 2028 for the bond rounds; an underwriting waiver costs $1,500 and an architectural waiver or an optional amenity request $2,500 (1).
- Threshold submission. DCA conducts a Threshold Criteria review only for applications selected under the Competitive Review process; the plan's deadlines for their Threshold submission, by 5:00 pm, are December 11, 2026 and December 10, 2027 for 9 percent credits and April 23, 2027 and April 21, 2028 for bond applications, and a bond application's Threshold submission must include the bond inducement resolution from the issuing authority (1).
- Carryover or Letter of Determination. DCA provides it within seventy-five days of the receipt of a complete Threshold submission (1).
- Cost review and closing. Owners submit a third party Front-End Cost Review, explain in writing any cost increase of more than 10 percent since the Competitive Application, and may not close equity until DCA approves or its forty-five day response period expires (1).
DCA's fee schedule sets a competitive application fee of $10,000 for a for-profit applicant and $8,000 for a non-profit, a Post-Award Allocation or Credit Processing Fee of 8 percent of the annual federal credit amount, and a Construction Monitoring Inspection Fee of $8,000 per development (1). Those are the agency's charges; what the DCA format market study itself costs for a Georgia site is covered on our feasibility study cost page.
How 9 percent, bond, HUD and USDA financing meets DCA's plan
The 9 percent round. A project may receive 9 percent credits on 130 percent of eligible basis under the state-designated boost, with a minimum request of 110 percent, if it is a multifamily Rural project without DCA-administered federal funding, lies in an area that qualifies for points under Stable Communities, or shows extraordinary circumstances (1). The price is a deferral of 1 percent of the total developer fee for every 1 percent of boost granted, unless the project receives a new source from an independent party equal to at least 30 percent of the fee (1). Preservation of an existing federal credit development with a placed in service date within fifteen years of the Competitive Application deadline is ineligible (1). The federal content of the report is on our LIHTC market study page.
The state credit. DCA's bond award document counts all bond financed awards, including those under the urban housing reservation, in the $100 million limitation (6). How a matching Georgia credit changes the sources of a deal is the subject of our affordable housing feasibility study page.
HUD-insured loans. The plan accepts HUD letters and lender preliminary commitments for projects under the 221(d)(3), 221(d)(4), 223(f) or 202 programs with the application, and requires final MAP Invitations by the deadline in its Exhibit A (1). The manual has the analyst note whether a proposed tax credit project would adversely impact HUD 221(d)(3), HUD 221(d)(4) and other market rate FHA insured properties (2). The programme itself is on our HUD multifamily market study page.
USDA Section 515 and Section 538. DCA may award up to two 9 percent applications that propose Preservation of USDA Section 515 properties and will ensure that at least 35 percent of Preservation awards are for Section 515 properties or properties in the Rural Pool (1). On the bond side it sets aside up to $20 million of Bond Allocation for one development per year that preserves Section 515 properties on a portfolio basis (1). For the 9 percent state-designated basis boost, an applicant with USDA 515 funding may ask DCA to waive the matching developer fee deferral (1). For a loan to be guaranteed under Section 538 the plan requires a lender preliminary commitment, which should clearly state any USDA guarantees and fees, and the lender must specify whether the annual USDA guarantee fee will be paid out of its principal and interest payments (1). The federal programme rules are on our USDA multifamily page.
Mixed-use buildings. Income from commercial space is not an eligible source of revenue in DCA's cash flow analysis, and the adjusted basis of a community service facility included in eligible basis cannot exceed $1,250,000 (1); the SBA and USDA business loan rules are set out on our SOP 50 10 8.1 and 7 CFR Part 5001 pages.
What our study tests on a Georgia site
- Pool, ceiling and survey area. The pool the county and its USDA eligibility place the site in, the credit request against the ceiling for its application type, and the manual's supply survey of all properties within two miles, or ten miles for Rural properties (1)(2).
- Analyst and dates. An analyst on DCA's approved list and a study completed no more than six months before Application Submission (1)(2).
- Capture rates. By bedroom type, by income segment and overall, net of unstabilized and pipeline units, against DCA's 30 or 35 percent, 40 percent, 50 percent and 60 percent limits (1)(2).
- Lease-up. The months needed to reach 93 percent against the twenty-four month limit, and the rent advantage at 60 percent of area median income and below against the 10 percent minimum (1).
- DSCR. Coverage in each of fifteen years at 1.20 for new construction or 1.25 for rehabilitation, run on DCA's inputs: the expense floor for the pool, revenue trended at 2 percent, expenses at 3 percent, and vacancy and collection loss at 7 percent or more (1).
- Break-even. Break-even occupancy is stated with the operating deficit, rent-up and replacement reserves at DCA's minimums.
- State credit. Equity with and without room under the $100 million cap, using the credit room DCA reports for the year (6).
- Bonds and Atlanta. Bonds against the plan's limit of 30 percent of aggregate basis, the $25 million request limit, and, for a site inside the city of Atlanta, which version of the plan and which awarding body apply (1).
- Closing costs and collections. The recording tax at $1.50 for each $500.00 of a long-term note, to the $25,000.00 maximum (12); and, for every residential lease entered into or renewed on or after July 1, 2024, the two month deposit ceiling and the three business day notice of House Bill 404 (8).
- Model studies. 9 Percent LIHTC Family Apartments in Macon-Bibb County, Georgia is a model study of 9 percent LIHTC family apartments in Macon-Bibb County, and USDA Section 538 Apartments in Tifton, Georgia is a model study of apartments under USDA Section 538 in Tifton.
Georgia jobs and rental vacancy, and the national apartment building cycle, autumn 2026
MMCG Invest is a multifamily feasibility study consultant for borrowers, lenders and CDCs. Renter demand in Georgia rests on payrolls. The state held 4,983.0 thousand nonfarm jobs in September 2026, seasonally adjusted, against 4,983.2 thousand in September 2025 (U.S. Bureau of Labor Statistics, Current Employment Statistics, as published by the Federal Reserve Bank of St. Louis, September 2026). Georgia's unemployment rate was 3.3 percent in September 2026, against 3.4 percent a year earlier (U.S. Bureau of Labor Statistics, as published by the Federal Reserve Bank of St. Louis, September 2026).
The Atlanta-Sandy Springs-Roswell metropolitan area had 3,108.6 thousand nonfarm jobs in September 2026 and an unemployment rate of 3.2 percent (U.S. Bureau of Labor Statistics, as published by the Federal Reserve Bank of St. Louis, September 2026). Georgia's gross domestic product was $936.1 billion in current dollars in 2025, against $884.8 billion in 2024 (U.S. Bureau of Economic Analysis, as published by the Federal Reserve Bank of St. Louis, 2025).
Georgia's rental vacancy rate was 6.6 percent in 2025, after 8.3 percent in 2024 (U.S. Census Bureau, as published by the Federal Reserve Bank of St. Louis, annual 2025). The national annual rate was 7.1 percent in 2025, so Georgia sat below it. The national quarterly rate has since moved up: 7.6 percent in the third quarter of 2026, against 7.1 percent in the third quarter of 2025 (U.S. Census Bureau, as published by the Federal Reserve Bank of St. Louis, third quarter 2026).
The national apartment building cycle is slowing. In buildings of five or more units, 677 thousand units were under construction in September 2026, seasonally adjusted, against 699 thousand in September 2025 (U.S. Census Bureau and HUD, as published by the Federal Reserve Bank of St. Louis, September 2026). Starts in such buildings ran at 349 thousand units, against 471 thousand a year earlier, and completions at 339 thousand, against 426 thousand. None of these is a submarket reading. A Georgia multifamily feasibility study replaces each with the occupancy, rents and pipeline counted in the subject's own market area.
HUD 221(d)(4) basic statutory mortgage limits, the FHA premium and agency purchase caps for Georgia multifamily loans in 2026
HUD's basic statutory mortgage limits for Section 221(d)(4) in calendar year 2026 start at $68,401 per zero bedroom unit in a non-elevator building and $73,889 in an elevator building. They rise to $133,121 and $146,274 for units of four or more bedrooms (HUD, Annual Indexing of Basic Statutory Mortgage Limits for Multifamily Housing Programs, Federal Register, May 6, 2026). These are the basic statutory amounts as HUD printed them, not the limit worked out for any one Georgia project.
HUD reduced the mortgage insurance premium to 0.25% for all FHA Multifamily Insurance Programs and eliminated the earlier rate categories (HUD, Federal Register notice, September 23, 2025). The reduced premium applies to applications submitted or amended on or after October 1, 2025 that have not been initially endorsed. For a worked illustration on a Texas site, see the model study of HUD 221(d)(4) market rate apartments in Celina, Texas.
For conventional permanent debt, the 2026 multifamily loan purchase caps are $88 billion each for Fannie Mae and Freddie Mac, $176 billion combined (Federal Housing Finance Agency, news release, November 24, 2025). At least 50 percent of the enterprises' multifamily business must be mission-driven affordable housing, and loans that finance workforce housing are excluded from the 2026 limits. A Georgia multifamily feasibility study tests coverage at the terms of the program the deal will close under.
SBA rules and fiscal 2026 loan approvals for Georgia multifamily borrowers
SBA loans rarely fit a rental apartment project. Passive businesses owned by developers and landlords that do not actively use or occupy the assets acquired or improved with the loan proceeds are ineligible, except Eligible Passive Companies under section 120.111 (13 CFR 120.110(c), January 1, 2025 edition). A landlord of residential units that does not occupy the property is therefore outside the 7(a) and 504 programs.
The loan files show how little SBA credit reaches the class in Georgia. Three codes cover it: lessors of residential buildings and dwellings (NAICS 531110), new multifamily housing construction (NAICS 236116) and residential property managers (NAICS 531311). Georgia borrowers under those codes together account for 6 loans with $3.17 million of gross approvals. That counts loans approved in fiscal 2026, as recorded in the SBA 7(a) FOIA loan file as of September 30, 2026. The SBA 504 FOIA loan file as of the same date records no Georgia loan under any of the three codes in fiscal 2026.
Across all industries, the same files record 1,596 Georgia 7(a) loans with $1.21 billion of gross approvals and 183 Georgia 504 loans with $294.0 million in fiscal 2026. The counts include approvals later cancelled and loans not yet disbursed, and the 504 figure is the SBA and CDC debenture amount alone. MMCG states in a Georgia multifamily feasibility study which loan program the project qualifies for before any debt is sized.
Frequently asked questions
Who may write the market study for a DCA application?
A market analyst approved by DCA, writing in the format of the DCA Market Study Manual, which states that the Market Analyst must be on DCA's approved list (1)(2). The analyst signs a statement that compensation is not contingent on the project being funded (2).
What capture rates does DCA treat as feasible?
In Metro Pool areas, 30 percent or less for one and two bedroom units, 40 percent for three bedroom units and 50 percent for four or more bedrooms, with an overall rate that shall not exceed 30 percent; in Rural Pool areas the one bedroom, two bedroom and overall figures are 35 percent (1). No bedroom type within an income segment may exceed 60 percent (1).
What DSCR and vacancy does DCA underwrite?
A minimum DCR of 1.20 for new construction and 1.25 for rehabilitation for fifteen years, each year standing alone, with vacancy and collection loss at the higher of 7 percent or a percentage DCA determines is appropriate (1). Operating expenses may not be budgeted below $6,500, $6,000 or $4,250 per unit, depending on the pool (1).
How large is Georgia's state housing credit, and is it capped?
DCA states that it is required to match the federal credit at 100 percent, dollar for dollar (5). House Bill 1199, as passed, capped the aggregate annual amount of credits allowed at $100 million for taxable years 2026 through 2028 (3), DCA's memorandum applies the cap to credits initially awarded in each year (5), and DCA's bond award document of August 21, 2026 reported $48,144,541 of credits remaining for bond financed awards (6).
Can DCA select a bond application inside the city of Atlanta?
Under the amended 2026-2027 plan, applications in the city of Atlanta are ineligible for selection under DCA's non-set aside strategy, and DCA will not take one as the final selected application unless no other non-selected application with requests at or below the amounts remaining qualifies under the geographic limitations and balancing criteria (1). The plan's General Set Aside and Disaster Rebuilding Set Aside selections are not considered in its geographic limitations (1). The urban residential finance authority determines awards under the urban reservation (6), and the earlier version of the plan said Atlanta applications were eligible under that reservation only (7).
Can an SBA 7(a) or 504 loan finance rental apartments in Georgia?
Generally no. A landlord that does not actively use or occupy the property is ineligible unless it is an Eligible Passive Company under section 120.111 (13 CFR 120.110(c), January 1, 2025 edition). An Eligible Passive Company leases its property to an operating company, must assign all rents under the lease as collateral, and cannot charge rent above the loan payment plus its direct costs of holding the property (13 CFR 120.111, same edition).
What are HUD's 2026 basic statutory mortgage limits under Section 221(d)(4) for one, two and three bedroom apartments?
The basic statutory limits for calendar year 2026 are $77,649 non-elevator and $84,706 elevator for a one bedroom unit, $93,859 and $103,004 for two bedrooms, and $117,808 and $133,252 for three bedrooms (HUD, Federal Register, May 6, 2026). They may be applied to applications submitted or amended on or after January 1, 2026 if the loan has not been initially endorsed.
Are Atlanta rents rising, and how much new housing is being permitted?
The consumer price index for rent of primary residence in the Atlanta area was 414.690 in October 2026, against 410.588 in September 2025, on a base of 1982 to 1984 equal to 100 (U.S. Bureau of Labor Statistics, as published by the Federal Reserve Bank of St. Louis, October 2026). Building permits authorized 2,874 new private housing units in the Atlanta metropolitan area in September 2026, against 3,279 in September 2025 (U.S. Census Bureau, as published by the Federal Reserve Bank of St. Louis, September 2026). The permit series covers all structure types, not apartments alone.
Sources
This page summarises public rules for feasibility planning and is not legal advice.
- Georgia Department of Community Affairs, State of Georgia 2026-2027 Qualified Allocation Plan, Georgia Housing Credit Program, amended version. https://dca.georgia.gov/document/document/2026-2027-qap-amended-board-approved-8-12-26/download. Read 2026-11-12.
- Georgia Department of Community Affairs, 2026 DCA Market Study Manual, Georgia Housing Credit Program. https://dca.georgia.gov/document/document/2026-market-study-manual/download. Read 2026-11-12.
- Georgia General Assembly, House Bill 1199, 2025-2026 session, as passed House and Senate, from the Governor's signed legislation page. https://gov.georgia.gov/document/2026-signed-legislation/hb-1199/download. Read 2026-11-12.
- Georgia General Assembly, Senate Bill 306, 2025-2026 session, House Committee on Rules substitute LC 44 3555S. https://www.legis.ga.gov/api/legislation/document/20252026/247342. Read 2026-11-12.
- Georgia Department of Community Affairs, Memorandum, 2026 Enrollment of H.B. 1199 and S.B. 306 Capping SLIHTC at One-Hundred Million, marked Updated 09.10.2026. https://dca.georgia.gov/document/document/memorandum-slihtc-2026-review-hb-1199-and-sb-306/download. Read 2026-11-12.
- Georgia Department of Community Affairs, 4% Credits/Bonds Award Process, published August 21, 2026. https://dca.georgia.gov/document/document/4-bond-award-processpdf/download. Read 2026-11-12.
- Georgia Department of Community Affairs, State of Georgia 2026-2027 Qualified Allocation Plan, earlier version. https://dca.georgia.gov/document/document/2026-2027-qapamendedpdf-0/download. Read 2026-11-12.
- Georgia General Assembly, House Bill 404, 2023-2024 session, Safe at Home Act, as passed House and Senate. https://www.legis.ga.gov/api/legislation/document/20232024/229083. Read 2026-11-12.
- Georgia General Assembly, House Bill 586, 2025-2026 session, as passed House and Senate, from the Governor's signed legislation page. https://gov.georgia.gov/document/2025-signed-legislation/hb-586/download. Read 2026-11-12.
- Georgia Department of Community Affairs, announcement of September 25, 2025, DCA awards more than $37 million in tax credits to bolster state's affordable housing. https://dca.georgia.gov/node/22336. Read 2026-11-12.
- Georgia General Assembly, Official Code of Georgia Annotated, Volume 37, 2024 Edition (Title 48, Chapters 7 and 8): Section 48-7-29.6. https://www.legis.ga.gov/api/document/docs/default-source/joint-features-document-library/t48-ch7-8-(v37)-2024-pdf.pdf. Read 2026-11-12.
- Georgia General Assembly, Official Code of Georgia Annotated, Volume 36, 2024 Edition (Title 48, Chapters 1 to 6): Sections 48-6-1, 48-6-60 and 48-6-61. https://www.legis.ga.gov/api/document/docs/default-source/joint-features-document-library/t48-ch1-6-(v36)-2024-pdf.pdf. Read 2026-11-12.