A site plan is a detailed visual representation of all the changes and enhancements planned for a property in a land development initiative. This plan serves as a critical guide for the project owner, civil engineer, architect, contractors, and regulatory bodies. It plays a significant role in budgeting, particularly in estimating costs related to site work and land development. Without a comprehensive site plan, and accompanying engineering construction drawings, accurately determining site-related expenses would be challenging.
Site plans typically encompass several elements, including the intended use of the property (commercial, residential, or mixed-use), necessary setbacks, open spaces, areas for amenities, stormwater management zones, parking and driveways, environmental considerations, and provisions for fire and emergency access, among others.
Civil engineers often take the lead in drafting these plans, with input from the project owner to align with their vision and financial or operational goals. Even minor adjustments to the site plan can lead to significant cost savings, emphasizing the importance of the project owner's involvement and understanding of the plan.
In addition to a site plan, a development project usually includes various engineering construction drawings, which provide detailed information about the site for contractors. These documents are tailored to the specific requirements of the municipality and the project, and they typically require inputs from various consultants, including environmental and geotechnical engineers. These professionals assess aspects like stream delineation and subsurface conditions, respectively. These investigations contribute to the construction drawings, which are then submitted for approval. Common elements in these documents include plans for existing conditions, utilities, grading, lighting, erosion control, landscaping, and architectural elevations.
The process of getting these plans approved is known as land entitlement. Each municipality has its own procedure for review and approval, which may include a technical review committee. The review of construction drawings and site plans often occurs simultaneously. The process usually involves multiple rounds of submission and revisions based on feedback from the approval authorities.
Real estate developers play a crucial role in this process. They come from diverse backgrounds and may not have formal training in analyzing engineering drawings. However, they can influence the approval process by understanding the technical details, managing land entitlement risks, and liaising with relevant parties. Developers with more experience are better positioned to provide constructive feedback and navigate the approval process effectively.